EXPLORATION - URUGUAY
Exploration & Development Strategy
Nico Perez Terrane
Isla Cristalina Belt
Dom Felliciano Belt
Piedra Alta Terrane
Cuchilla Dionisio Terrane






DOM FELLICIANO BELT



The Dom Feliciano fold and thrust belt forms the eastern margin of the Nico Perez Terrane which is controlled by the Sierra Ballena fault forming roughly the SE third of the exposed Proterozoic granite-greentone rocks of Uruguay .  The belt is the result of a protracted phase of NW-directed contractional deformation associated to the collision of the Cuchilla Dionisio Terrane (to the east) with the Nico Perez and Piedra Alta terrane (to the west) during the Pan African/Brasiliano event (600-650Ma).   This collision produced a wide fault contact or suture called the Dom Feliciano fold and thrust belt that trends NNE, is about 250km by 50 kilometers wide and is host to both the Texas and Presidente Terra gold Exploration projects. 

Texas

The Texas gold prospect is located about 295 km via paved road to the San Gregorio Mine site near the town of Treinta y Tres Texas is in the north of the Don Feliciano fold and thrust belt where a recent surface exploration program discovered gold mineralization associated to quartz-pyrite veins over a 1km x 5km area.  The mineralization is hosted in relatively un-deformed pink granites however mapping and sampling identified numerous mineralized veins with grades up to 72g/t Au; out of 463 rock chip samples 140 returned grades greater than 0.5g/t.   Texas is a high priority exploration target for OMI and is permitted and ready for drilling in F2010. 

Presidente Terra

The Presidente Terra Exploration project is located 240km NE from Montevideo or 370 km NW by road to the San Gregorio mine site.  NNE trending mineralized quartz veins and shears flank the regional scale Sierra Ballena strike-slip fault zone.  Gold bearing quartz veins are hosted in granites, quartzites, meta-sediments and along lithologic contacts.  Mineralization is interpreted to be controlled by shears that have focused hydrothermal fluids into receptive lithologies and dilatational traps.  Surface sampling and geological mapping traced mineralization along strike for over 11 kilometers with surface rock chip samples reaching grades up to 300g/t.  Drilling to date has typically intersected erratic narrow zones of 1-2m @ 1-5g/t however a few holes intersected wider zones at similar grades and even a couple of holes intersected 1-3m @ 10g/t or more (see table of results below).  No resource has been defined to date at the Presidente terra project however but OMI considers there to be potential   About half of the strike extent of the mineralized system has been drill tested with over 8,000m of wide spaced diamond and RC drilling and follow-up is planned for F2010.  

Presidente Terra RC Drilling Results 

Hole ID

Intercept

(>0.5g/t Au)

From

PT_08_001

4m @ 1.31g/t

36

PT_08_002

5m @ 1.66g/t

31

PT_08_003

1m @ 1.55g/t

30

PT_08_005

2m @ 3.11g/t

72

PT_08_006

1m @ 2.31g/t

40

PT_08_006

1m @ 24.86g/t

43

PT_08_007

1m @ 1.21g/t

29

PT_08_007

1m @ 1.16g/t

33

PT_08_007

1m @ 1.84g/t

38

PT_08_007

8m @ 1.15g/t

42

PT_08_007

2m @ 2.15g/t

60

PT_08_011

1m @ 1.91g/t

11

PT_08_015

2m @ 2.39g/t

54

PT_08_015

1m @ 1.09g/t

109

PT_08_021

2m @ 2.79g/t

46

PT_08_026

1m @ 1.60g/t

7

PT_08_026

2m @ 6.74g/t

23

PT_08_027

4m @ 2.83g/t

17

PT_08_027

1m @ 2.92g/t

116

PT_08_029

3m @ 10.78g/t

36

PT_08_031

4m @ 3.35g/t

10

PT_08_031

5m @ 1.07g/t

23

PT_08_031

1m @ 1.06g/t

85

PT_08_032

2m @ 1.76g/t

86

PT_08_032

1m @ 1.61g/t

92

PT_08_036

3m @ 0.82g/t

11

PT_08_037

2m @ 1.61g/t

89

PT_08_038

1m @ 4.74g/t

20

PT_08_039

1m @ 2.29g/t

59

PT_08_040

2m @ 4.68g/t

45

PT_08_040

2m @ 1.59g/t

72

PT_08_041

2m @ 5.45g/t

31

PT_08_043

1m @ 4.09g/t

84

PT_08_044

1m @ 5.93g/t

142

PT_08_044

2m @ 3.09g/t

145

PT_08_045

3m @ 1.04g/t

24

PT_08_046

3m @ 15.07g/t

35

PT_08_046

1m @ 1.68g/t

46

PT_08_049

3m @ 2.27g/t

39

PT_08_050

1m @ 2.50g/t

90

 

Presidente Terra Diamond Drilling Results 

Hole ID

DD Intercept (>0.5g/t Au)

From

PT_08_019DDH

1.56m @ 10.21g/t

26.08

PT_08_019DDH

1m @ 2.26g/t

53

PT_08_022DDH

0.74m @ 1.20g/t

22.36

PT_08_022DDH

0.93m @ 0.61g/t

24.8

PT_08_022DDH

4.28m @ 1.55g/t

27.72

PT_08_022DDH

0.82m @ 0.09g/t

36.73

PT_08_022DDH

0.7m @ 1.95g/t

42.8

PT_08_022DDH

1.01m @ 1.39g/t

58.73

PT_08_023DDH

0.5m @ 0.96g/t

84.3

PT_08_025DDH

0.36m @ 0.58g/t

22.74

PT_08_030DDH

0.57m @ 0.77g/t

19.78

PT_08_030DDH

0.7m @ 2.78g/t

22.4

PT_08_030DDH

0.66m @ 0.57g/t

30.22

PT_08_030DDH

0.91m @ 0.71g/t

49.94

 

 

Copyright 2011 Orosur Mining
Legal Information and Terms of Use
Company Profile | Home | Corporate | Mining | Exploration - Uruguay | Exploration - Non-Gold | Exploration - Chile | Investors | News | Contact Us | Media | Site Map